Paving and chipseal projects
District 1 – Glenwood area roads
Road Name and Number: Panorama Subdivision Roads
CR 170 Panorama DR 2.88 miles
CR 78 Buck Point RD .94 miles
CR 79 Basalt MTN RD .29 miles
CR 80 Elk Range RD .43 miles
CR 81 Sunlight DR .28 miles
Project Description: All roads within the Panorama Sub. Will receive a 3/8 chip and fog seal.
• Preparation Activities: crack sealing, culverts jetted, ditches pulled.
• Estimated duration: 1 week
• Resurfacing by Contractor: GMCO
• Estimated duration: 1 week
• Expected Delays: Minimal
• Alternate Route: none
Road Name and Number: CR 102 Missouri Heights RD
Project Description: Entire length of CR 102 from CR 100 intersection to County line 2.40 miles will receive 3/8 chip and fog coat.
• Preparation Activities: crack sealing, culverts jetted, ditches pulled.
• Estimated duration: 1 week
• Resurfacing by Contractor: GMCO
• Estimated duration: 2 Days
• Expected Delays: Minimal
• Alternate Route: None
Road Name and Number: CR 103 Side roads
CR 103A Old Orchard .12 miles
CR 103B Deer Path .23 miles
CR103C Red Wing. 28 miles
Project Description: All 3 roads off of CR 103 will receive a 3/8 chip and fog seal.
• Preparation Activities: crack sealing, culverts jetted, ditches pulled.
• Estimated duration: 1 week
• Resurfacing by Contractor: GMCO
• Estimated duration: 3 Days
• Expected Delays: Minimal
• Alternate Route: none
Road Name and Number: Kings Row Sub.
CR 161 Kings Row 1.4 miles
CR 161A Prince DR .40
Project Description: Both roads in Kings Row subdivision off of CR 102 will receive a 3/8 chip and fog seal.
• Preparation Activities: crack sealing, culverts jetted, ditches pulled.
• Estimated duration: 1 week
• Resurfacing by Contractor: GMCO
• Estimated duration: 3 Days
• Expected Delays: Minimal
• Alternate Route: None
Road Name and Number: CR 105 Cerise
Project Description: From CR 103 to end of ROW .53 miles new 4” asphalt mat
• Preparation Activities: Grade and roll existing gravel surface. Prep apron area along CR 103. Jet culverts and perform ditch maintenance.
• Estimated duration: 2 days
• Resurfacing by Contractor: Grand River Construction
• Estimated duration: 2 days
• Expected Delays: Possible road closures due to narrowness of roadway.
• Alternate Route: none
Road Name and Number: CR 125 Dry Park
Project Description: Pave 4” apron from edge of CR 108 to front edge of cattle guard to eliminate potholing and save the edge of CR 108 from turning vehicles.
• Preparation Activities: Prep road base down 4” Install new cattle guard
• Estimated duration: 2-3 days
• Resurfacing by Contractor: Grand River Construction
• Estimated duration: 1 Day
• Expected Delays: Minimal
• Alternate Route: HWY 82
Road Name and Number: CR 106 Satank HWY 82 side
Project Description: 2” asphalt overlay .65 miles. From cattle guard at HWY 82 to turn around/Cul-de-sac
• Preparation Activities: Jet culverts, pull ditch, hot patch holes
• Estimated duration: 2 days
• Resurfacing by Contractor: Grand River Construction
• Estimated duration: 2 Days
• Expected Delays: Minimal
• Alternate Route: none
District 2 – Rifle/Silt areas
Road Name and Number: CR 210 – Mile Pond Rd
Project Description: Chipseal
• Preparation Activities: Already completed
• Estimated duration: N/A
• Resurfacing by Contractor: G.M.C.O
• Estimated duration: July
• Expected Delays: Minimal
• Alternate Route: Peterson LN (CR 223)
Road Name and Number: CR 233 chipseal
Project Description:
This project will begin @ 7th street in silt and extend west for 4.3 miles to just past CR 223 (Peterson ln). We are completing a double pin chipseal to preserve the road surface. The job entails 5 culvert pipes to be replaced.
• Preparation Activities: Crackseal, Shouldering/ditch cleaning, cleaning out/replacing culverts
• Estimated duration: 5/26/25
• Resurfacing by Contractor: Chipseal completed by G.M.C.O.
• Estimated duration: July
• Expected Delays: Daily road closures from CR 225 to CR 227
• Alternate Route:
District 3 – Rifle/Parachute chipseal
Road Name and Number: CR 301 – Morrisania Mesa Rd.
Project Description: This project will begin at the intersection of CR 301 and CR 300n and extend to CR 301 and CR 309 intersection. Preparations will include minimal culvert maintenance along with crack sealing before a double pin chip seal is applied.
· Preparation Activities: Culvert maintenance and crack sealing
· Estimated duration: 2-3 weeks
· Resurfacing by Contractor: Chipseal by GMCO
· Estimated duration: Between July and end of August
· Expected Delays: Minimal
· Alternate Route: CR 309 from Battlement to Rulison (vice versa) for through traffic no alternate for local
Road Name and Number: CR 308 – Four Corners Rd. chipseal
Project Description: This project will begin at the intersection of CR 300 and CR 308. Preparation activities will include ditch cleaning, culvert maintenance and crack sealing
· Preparation Activities: Ditch Cleaning, culvert maintenance and crack sealing
· Estimated duration: 2-3 weeks
· Resurfacing by Contractor: Chipseal by GMCO
· Estimated duration: Between July and end of August
· Expected Delays: Minimal
· Alternate Route: Local traffic for Garden lane us CR 300-0 to CR 303 or CR 300 to CR 302